This study investigates ways to remove transport barriers and connect spatial priority areas along the northern section of the A41 East Wirral corridor with the aim of improving investment, creating jobs and developing skills in the area.
- T7.1 - Draft A41 Corridor Study 2018
- T7.2 - Draft A41 Corridor Study Preferred Options Report 2019
- T7.3 - Draft A41 Corridor Study Preferred Options Scheme Drawings 2018 A
- T7.4 - Draft A41 Corridor Study Preferred Options Scheme Drawings 2018 B
- T7.5 - Draft A41 Corridor Study Preferred Options Scheme Drawings 2018 C
To make comments on any of these documents, visit the Evidence Base consultation on the Council's Consultation Portal.